Saeed & Mohammed Al Naboodah Group logo

United Arab Emirates
Dubai Creek Golf & Yacht Club

Completion date: April 2005

Providing infrastructure at the Dubai Creek Golf & Yacht Club entailed the construction of roads, car parking, soil drainage, water reticulation, irrigation installation and installation of a fire sprinkler system, storm water disposal and sub-soil drainage systems. The project also covered the installation of the electrical and data sleeves.

At the same time, the existing back then 9 holes were also remodelled with improvements to the fairways, landscaping, lake walls and lakes. A complete new front 9 hole course was also constructed, which also included new lake features and pedestrian tunnels.  The feature of this new work was the 6th tee box constructed in the Creek, which is accessed by a footbridge.