Parallel Roads Project

Completion date: June 2011
   
Client: Government of Dubai - Roads and Transport Authority (RTA)

The Parallel Roads Project is a series of major infrastructure works commissioned by the RTA to provide a strategic link between Sheikh Zayed Road and the Inner Ring Road. This ongoing work has been commissioned to help upgrade the primary infrastructure and alleviate heavy traffic flow in this densely populated area of Dubai.

Al Naboodah Construction Group was awarded work on Parallel Roads 3b, one of the key contracts within this project. This work is scheduled for completion in June 2011. It involved extensive service works, both new and refurbishment, plus the construction of  a four lane dual carriageway. All the new and improved networks have been connected via a series of signalised junctions and grade separated interchanges.

The interchanges are made up of six bridges and three underpasses. Each bridge follow s the standard post tensioned box girder design, ranging from two lanes to six lanes in width, and up to 280m long. The three underpasses are heavily reinforced structures, ranging from 400m to 600m long  with two to six lanes wide, finished with architectural tiling.