Embankment Dam
|
Completion date:
|
April 1998
|
In March 1997, the construction of the first major dam to be built in the town of
Hatta began. The scheme was designed by Dubai Municipality and was the first dam
in the Emirates to use an extruded asphalt core.
Prior to the construction of the major earthwork embankment with an integral asphalt
core, a preliminary diaphragm cut-off wall was installed. The final embankment was
protected by graded rock, with an injection of grout to prevent water passing through.
A 30 metre wide concrete spillway, a diversion supply and an access road were added
to complete the structure.
Impounding of the dam took place in the winter of 1998 and the reservoir took approximately
two years to fill.
This sustainable water supply has provided much needed relief to the town of Hatta
who, over the years, had witnessed a progressive deterioration of existing dams
and wells and the loss of significant fresh water supplies into the surrounding
wadi basin.
|